• Cement, Sand& ProppantDeployment.

    Cement, Sand
    & Proppant
    Deployment.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • High CapacityFillerTubes.

    High Capacity
    Filler
    Tubes.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • DeployedViaSlickline.

    Deployed
    Via
    Slickline.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • Rated up to200ºC &15,000psi.

    Rated up to
    200ºC &
    15,000psi.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • 1
  • 2
  • 3
  • 4

Well Abandonment | Cement Dump Bailer

Cement Dump Bailer Ortho

The Omega Cement Dump Bailer is a single shot device which has been designed to accurately deliver large volumes of Cement/Acid/Chemicals/Sand or Proppant to a downhole location via slickline or braided line.

Due to its modular design, the Dump Bailer actuator can be made up to any number or size of tube sections. The number and diameter of these tubes is dictated by the available rig up height, minimum well bore restriction and the final overall toolstring weight.

The electronic timer is pre programmed at surface prior to running by the setting of two rotary switches, these select the appropriate delay time for the Dump Bailer downhole activation. Once the Dump Bailer is filled and prepared for deployment, the time delay period is started by simply threading the nose cone fully in to the Actuator body of the tool.

Following expiry of the pre-programmed time delay, well pressure floods a hydrostatic chamber in the Actuator, this provides the upward motion required to fully open the valve sleeve. The previously contained Cement/Acid/Chemical/Sand or Proppant is now free to drain from the tube sections via the large flow ports on the Actuator at the desired downhole location.

Download The Cement Dump Bailer Data Sheet

Cement Dump Bailer Data Sheet a

 

 

Case History

Cement Dump Bailer Successfully Isolates Problem Well