• Mechanical OrPressureActivation.

    Mechanical Or
    Pressure
    Activation.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • AdjustableShearLoad.

    Adjustable
    Shear
    Load.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • Remains OpenOnceEqualised.

    Remains Open
    Once
    Equalised.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • HighlyDebrisTolerant.

    Highly
    Debris
    Tolerant.

    For more information about our products please contact our sales team on +44(0)1224 772744 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.



  • 1
  • 2
  • 3
  • 4

Well Isolation | Pump Open Sub

Dual Equalising Sub Ortho

The Pump Open Sub is designed to provide an equalising facility, prior to the retrieval of a bridge or blanking plug. Alternatively, by attaching the Pump Open Sub to any packer or lock, it provides a positive barrier between the tubing and the well bore fluid below.

The Pump Open Sub is run in hole in the closed position. Pressure can be applied to the tubing to pressure test and set completion equipment above the tool.

The Pump Open Sub is opened to allow equalisation prior to the retrieval of the plug or lock, or to allow production well fluid to flow up into the tubing above. This is achieved in one of two ways. Pressure can be applied to the tubing which results in a load being applied to the shear screws, once a predetermined load is reached the screws shear, allowing the plunger to drop down inside the larger bore, a snap ring on the plunger then engages in a recess within the lower bore positively locking the tool open.

The plunger can also be mechanically pushed off seat using a prong. Sufficient load needs to be transferred through the plunger into the shear screws, the plunger is then pushed to the bottom of the tool and locked in position.

Download The Pump Open Sub Data Sheet

Pump Open Sub Data Sheet

For more information about our products please contact : This email address is being protected from spambots. You need JavaScript enabled to view it.